Bhubaneswar: Senior-most trackman of the Section waved the green flag to the first engine rolling on the newly-constructed bridge No 588 between Theruvali – Singapur Road of Sambalpur Division in presence of Sambalpur DRM and Chief Engineer/Construction/ECoR.
The earlier bridge was completely washed away in floods last year.This new bridge was constructed in record time of 200 days.
Due to heavy rain causing flood situation in Rayagada district, Railway Bridge Number 585 between Theruvali and Singapur Road Railway Stations in Titilagarh-Rayagada Railway Section washed away on July 17.
Alert Gangman stopped the approaching goods train, which was supposed to pass on this bridge, and averted an accident.
Berhampur: Six persons, including two night watchmen and four sevayats, have been arrested for the…
Mumbai: Upholding a 10-year sentence for a man against whom his wife had lodged a…
New Delhi: Canada’s Peel Police on Thursday issued a statement clarifying the altercation between a…
Bhadrak: A dismembered body of a bank employee was found near Kednuapada railway station in…
Rourkale: Grocery and gift items worth lakhs were reduced to ashes in a massive fire,…
Malkangiri: A 12-year-old girl girl reportedly drowned in a pond during Boita Bandana ritual on…
New Delhi: President-elect Donald Trump on Friday announced that Robert F Kennedy Jr. would lead…
Bhubaneswar/Cuttack: People gathered at Gadagadia Ghat in Cuttack and Bindu Sagar tank in Bhubaneswar before…