Malkangiri: The Works Department has started repairing a bridge over Gurupriya River in Malkangiri district after cracks appeared on the middle of the structure.
According to reports, the rods at the expansion joint on a girder of the bridge have twisted.
The Junior Engineer of Works Department, Suresh Chandra Mishra, however, said it is a minor repair that will be completed in two days. “There is a slight bend of the steel angle at the expansion joint on the girder in pillar no-16. We will replace this steel angle with a new angle,” Mishra added.
Notably, Chief Minister Naveen Patnaik had inaugurated the 910-m-long Gurupriya bridge on July 26, 2018. The bridge connects 151 villages in seven panchayat areas in the cut-off area in Malkangiri district to the mainland.
The construction of the bridge had begun in 2014 and was built at a cost of Rs 187.25 crore.
Stay ahead with Odisha Bytes Breaking News - your ultimate source for the fastest, most…
New Delhi: After the record-breaking success of ‘Pushpa 2: The Rule’, Rashmika Mandanna has her…
Bhubaneswar: Twelve members of Village Water and Sanitation Committees (VWSC) from nine districts of Odisha…
Hyderabad: Bollywood actress Janhvi Kapoor, who is rumoured to be dating Shikhar Pahariya, had once…
Bhubaneswar: In a remarkable stride toward strengthening industrial ecosystem, the Odisha government on Wednesday approved…
Bengaluru: Playing away from home, Odisha FC turned the game on its head to snatch a…
This website uses cookies.