Odisha

ECoR Achieves Breakthrough In 2-Km Tunnel On Khurda Road-Balangir New Line Project In Odisha

Bhubaneswar: In a significant achievement in Khurda Road-Balangir rail line project, the East Coast Railway (ECoR) has successfully completed the breakthrough of a 1,975-meter-long tunnel (Tunnel No. 07) between Purunakatak and Charichhak.

This marks a critical step forward in the ongoing efforts to expand and improve rail connectivity in the region.

The Ministry of Railways has prioritised the timely completion of key infrastructure projects in Odisha, recognising their importance to the state’s development. The Khurda Road-Balangir line is one such project, aimed at enhancing connectivity and fostering economic growth in the region.

Railway Minister Ashwini Vaishnaw, has been closely monitoring the progress of various railway projects across Odisha.

The breakthrough of the 1,975-meter tunnel was achieved by the skilled engineering team of the ECoR Construction Wing, which carried out the final detonation in Boudh district. This milestone is a testament to the dedication and technical expertise of the team involved.

Of the total 301 kilometres planned for the Khurda Road-Balangir project, 183 kms of the rail line have already been commissioned. The project is being executed from both ends, Khurda Road and Balangir, to expedite its completion.

To date, 106 kms from Khurda Road to Daspalla and 77 kms from Balangir to Jharmunda have been commissioned. Additionally, the 16.27-km stretch from Jharmunda to Boudh is also complete. The next segment, from Boudh to Purunakatak, covering approximately 27 kms, is anticipated to be finished within the coming months.

The completion of such large-scale railway projects hinges on various factors, including timely land acquisition, forest clearance, relocation of utilities, obtaining statutory clearances, and managing the geological and topographical challenges of the area. Despite these hurdles, significant progress has been made.

Once completed, the Khurda Road-Balangir line will significantly reduce the distance between Bhubaneswar and Balangir. Moreover, this project is expected to be a major catalyst for the socio-economic development in the region.

OB Bureau

Recent Posts

Taimur Taking Dad Saif To Hospital After The Attack Is ‘Unimaginable’, Says Former Nanny Lalita D’Silva

Mumbai: Lalita D'Silva, Taimur's former nanny, expressed her disbelief over the news of the seven-year-old…

1 hour ago

59 Diagnosed With Rare Brain Condition In Pune; What Is Guillain-Barre Syndrome?

Pune: As many as 59 people have been diagnosed with Guillain-Barre Syndrome (GBS), a rare…

2 hours ago

Fishing Cat Rescued From Canal Near A Village In Odisha’s Mayurbhanj

Baripada: Forest officials on Thursday rescued a fishing cat was rescued from a canal near…

2 hours ago

Brown Sugar Worth Over Rs 7 Lakh Seized, One Arrested In Odisha’s Balasore

Balasore: Excise officials have seized brown sugar worth more than Rs 7 lakh and arrested…

2 hours ago

Pakistan’s Draconian New Law: Criticism Of Govt, Military, Judiciary Now A Criminal Offence

Lahore: In a bid to tighten control over social media, Pakistan is set to bring…

2 hours ago

BJD Criticises Odisha Assembly Speaker For Partisan Statement

Bhubaneswar: The BJD has taken a strong exception to the statement of Odisha Assembly Speaker…

2 hours ago