India

How The Bailey Bridge Built By Army In 31 Hours Will Help Rescue Operations In Wayanad

New Delhi: The Indian Army on Thursday completed the construction of a Bailey bridge to connect the worst affected areas in the landslides in Kerala’s Wayanad as search continued for survivors and bodies.

The bridge, Cl 24 Bailey Bridge connects Chooralmala with Mundakkai over the Iruvanipzha River and was completed in a record time. It was opened for public use on Thursday at 5.50 pm, the Army said in a statement.

The bridge can withstand a weight of 24 tonnes and is 190 feet long, the Army said, according to India Today.

After the completion, Major General VT Mathews, the General Officer Commanding (GOC) of Karnataka Kerala Sub-Area, passed from the bridge in his official vehicle.

The panels, each 10ft long, for the Bailey bridge were shipped from  Bengaluru in 20 trucks to Chooralmala on Tuesday, July 30, the same day the landslide struck Wayanad, Major General Mathew, spearheading the operation told ONManorama. A total of 19 steel panels were used to build the 190-ft  bridge, which is supported by a single pier.

At least 289 people have been killed after massive landslides struck Kerala’s Wayanad district. With nearly 200 people missing, the death toll is expected to rise.

Fact File

  • The landslides occurred around 2 am and 4.10 am on Tuesday, catching people off-guard in their sleep.
  • The villages of Mundakkai, Chooralmala, Attamala, and Noolpuzha have been devastated by the massive landslides triggered by torrential rains.
  • According to Kerala’s Revenue Minister K Rajan, over 1,600 rescue workers, including from the Army, Navy, NDRF and the police have been in the landslide-hit region carrying out the intensive rescue mission.
  • Political leaders, including Chief Minister Pinarayi Vijayan and the Leader of Opposition (LoP) in the Lok Sabha, Rahul Gandhi, and his sister Priyanka Gandhi Vadra, among others, visited the displaced people, expressing their solidarity with them.

What is a Bailey bridge?

A Bailey bridge is a type of portable, pre-fabricated, truss bridge. It was developed in 1940–1941 by the British for military use during the Second World War and saw extensive use by British, Canadian and American military engineering units.

Where does it get the name from?

Introduced in 1940 by a British engineer Sir Donald Bailey, the concept behind the Bailey Bridge was to provide a temporary bridge that could rapidly and manually be erected in wartime conditions and that could sustain the load of heavy tanks and other machinery.

OB Bureau
Share
Published by
OB Bureau

Recent Posts

High Court Stays Appointment Of 2753 MPHWs In Odisha

Cuttack: The Orissa High Court on Monday directed the Odisha Sub-Ordinate Staff Selection Commission (OSSSC)… Read More

18 seconds ago

Kartik Aaryan’s ‘Aashiqui 3’ To Go On Floors Next Month

Mumbai: ‘Aashiqui 3’, the highly-anticipated third instalment of the blockbuster franchise starring Kartik Aaryan in… Read More

18 minutes ago

Udit Narayan Controversy: Old Videos Of Singer Kissing Female Celebrities Go Viral

New Delhi: Singer Udit Narayan recently stirred up a hornet’s nest after kissing a female… Read More

25 minutes ago

Bigg Boss 18 Winner Karan Veer Mehra & Sandiip Sikcand Take A Dig At Vivian Dsena [Watch]

Mumbai: ‘Bigg Boss 18’ winner Karan Veer Mehra recently partied with close friends Shilpa Shirodkar,… Read More

28 minutes ago

38th National Games Rocked By Match-Fixing Scandal; Director Of Competition Fired

New Delhi: A major match-fixing scandal has hit the 38th National Games, which is underway in… Read More

36 minutes ago

Trouble Mounts For Senior Odisha IAS Officer Manish Agarwal In PA Death Case As Court Issues NBW

Bhubaneswar: A court in Odisha has issued non-bailable warrant (NBW) against senior IAS officer Manish… Read More

40 minutes ago