Balangir: The newly-laid broad gauge rail line of around 10.65km between Bichhupali and Jhartarbha of Khurda Road-Balangir rail line project was commissioned on Saturday
According to sources, Commissioner Railway Safety (CRS) had given its content after inspecting the new rail line on November 10 and declared the 289km Khurda Road-Balangir rail line project as fit for commissioning.
Altogether, 115.65km-long rail line work of the total project has been commissioned.
The East Coast Railway (ECoR) is constructing the line from both sides – from Khurda Road and Balangir for early completion of the project. “The ECoR is committed to the development of Railway infrastructure in the region and working dedicatedly to complete the project before the target,” a senior railway official said.
Cuttack: Madhupatana Police recently rescued a 17-year-old Bangladeshi girl, a suspected victim of trafficking and…
Mumbai: With the Bharatiya Janata Party (BJP), Shiv Sena and the NCP alliance emerging victorious in…
Balasore: The driver of a container truck was charred to death after the vehicle caught…
Nuapada: At least 80 people were arrested during a massive crackdown on illegal gambling activities…
Bhubaneswar: The Odisha government has transferred Special Secretary, Planning and Convergence, Chitra Arumugam and posted…
Sambhal: A violent clash erupted in Uttar Pradesh’s Sambhal on Sunday after a group opposed…
Mumbai: Television actress Hina Khan, who is battling breast cancer, recently met host Salman Khan…
Mumbai: Following reports of his alleged link-up with bassist Mohini Dey, renowned music composer AR…