Bhubaneswar: Senior-most trackman of the Section waved the green flag to the first engine rolling on the newly-constructed bridge No 588 between Theruvali – Singapur Road of Sambalpur Division in presence of Sambalpur DRM and Chief Engineer/Construction/ECoR.
The earlier bridge was completely washed away in floods last year.This new bridge was constructed in record time of 200 days.
Due to heavy rain causing flood situation in Rayagada district, Railway Bridge Number 585 between Theruvali and Singapur Road Railway Stations in Titilagarh-Rayagada Railway Section washed away on July 17.
Alert Gangman stopped the approaching goods train, which was supposed to pass on this bridge, and averted an accident.
Bhubaneswar: Gold and silver ornaments worth lakhs of rupees were looted from a jewellery shop…
Bengaluru: An arrest warrant was issued against former Indian cricketer Robin Uthappa for allegedly committing…
Bhubaneswar: As the depression over the Bay of Bengal is likely to weaken gradually in…
New Delhi: In what may be a setback to the Aam Aadmi Party (AAP) ahead…
Cuttack: Upset with the poor performance of 12 government employees in executing duties assigned under…
Bhubaneswar: The Bhubaneswar Municipal Corporation (BMC) on Saturday postponed Patha Utsav scheduled on December 22…
This website uses cookies.