Bhubaneswar: Senior-most trackman of the Section waved the green flag to the first engine rolling on the newly-constructed bridge No 588 between Theruvali – Singapur Road of Sambalpur Division in presence of Sambalpur DRM and Chief Engineer/Construction/ECoR.
The earlier bridge was completely washed away in floods last year.This new bridge was constructed in record time of 200 days.
Due to heavy rain causing flood situation in Rayagada district, Railway Bridge Number 585 between Theruvali and Singapur Road Railway Stations in Titilagarh-Rayagada Railway Section washed away on July 17.
Alert Gangman stopped the approaching goods train, which was supposed to pass on this bridge, and averted an accident.
Mumbai: ‘Emergency’ actor-director Kangana Ranaut has finally opened up about her film not being allowed…
Bhubaneswar: Odisha's main opposition party Biju Janata Dal (BJD) has appointed its MLA Pratap Keshari…
Washington: The differences in opinion, the bitter mutual attacks during the Presidential campaign were forgotten on…
Sundargarh: Some unidentified miscreants allegedly looted ornaments and cash worth over Rs 1.5 crore from…
Mumbai: Several websites and social media handles recently carried reports about Tabu's views on marriage,…
Bhubaneswar: Tata Power Renewable Energy Limited (TPREL) has signed a Memorandum of Understanding (MoU) with…
This website uses cookies.