Uncategorized

Rayagada Gets Replacement For Flood-Washed Bridge In Record Time

Bhubaneswar: Senior-most trackman of the Section waved the green flag to the first engine rolling on the newly-constructed bridge No 588 between Theruvali – Singapur Road of Sambalpur Division in presence of Sambalpur DRM and Chief Engineer/Construction/ECoR.

The earlier bridge was completely washed away in floods last year.This new bridge was constructed in record time of 200 days.

Due to heavy rain causing flood situation in Rayagada district, Railway Bridge Number 585 between Theruvali and Singapur Road Railway Stations in Titilagarh-Rayagada Railway Section washed away on July 17.

Alert Gangman stopped the approaching goods train, which was supposed to pass on this bridge, and averted an accident.

OB Bureau

Recent Posts

Jewellery Shop Looted In Bhubaneswar; Hunt On For Burglars

Bhubaneswar: Gold and silver ornaments worth lakhs of rupees were looted from a jewellery shop…

6 minutes ago

Where’s Robin Uthappa? Arrest Warrant Issued Against Cricketer For PF Fraud

Bengaluru: An arrest warrant was issued against former Indian cricketer Robin Uthappa for allegedly committing…

9 minutes ago

Rain Intensity In Odisha To Fall Tomorrow; Temp To Drop By 2-4°C After 2 Days

Bhubaneswar: As the depression over the Bay of Bengal is likely to weaken gradually in…

20 minutes ago

Jolt To AAP Before Delhi Polls? Lt Guv Gives Nod To Prosecute Arvind Kejriwal, Say Reports

New Delhi: In what may be a setback to the Aam Aadmi Party (AAP) ahead…

52 minutes ago

MGNREGA Poor Show: Salary Of 12 Govt Staff Withheld In Cuttack

Cuttack: Upset with the poor performance of 12 government employees in executing duties assigned under…

1 hour ago

Patha Utsav In Bhubaneswar Postponed Due To Rain

Bhubaneswar: The Bhubaneswar Municipal Corporation (BMC) on Saturday postponed Patha Utsav scheduled on December 22…

2 hours ago

This website uses cookies.