Bhawanipatna: The authorities of the Indravati Dam have started the repair of the tunnel no-4 following leakage of the reservoir water on Sunday.
The incident came to light after the dam authorities noticed the massive flow of water outside the tunnel no-4 in the morning.
Notably, the Indravati hydro-power channel receives water through four tunnels of the reservoir. The maximum generation capacity of the Indravati hydro-power unit is 600 MW.
Though the dam authorities had repaired the four tunnels to prevent leakage of reservoir water, the water continued to leak from the tunnel no-4.
Asked whether the leakage of water would hamper power generation, the dam authorities said that the water from the two tunnels would be sufficient to generate power.
They said the tunnel no-4 has been closed and the repair work is going in a war-footing.
Dubai: ODI cricket, Pakistan – they bring out the best in Virat Kohli. The Dubai… Read More
Cuttack: Three criminals were arrested by Choudwar police in Odisha’s Cuttack district for allegedly looting… Read More
Kolkata: Odisha FC fought gallantly in the lion’s den but finally returned empty-handed. Up against league… Read More
Kolkata: A West Bengal secondary board exam (Madhyamik) candidate recently took Artificial Intelligence (AI) to… Read More
New Delhi: A fourth batch of Indian nationals deported from the US arrived at Indira… Read More
Berhampur: Rushikulya river mouth in Odisha’s Ganjam district has emerged as a major rookery for… Read More
This website uses cookies.