We have the State Data Centre operated by OCAC since 2011. Recently, the RBI Data Centre was inaugurated by the Prime Minister on the outskirts of the capital city. Added to this, the Chief Minister has laid foundation stone for another data centre promoted by Adani Group, near Naraj. Further, as per available information, the Odisha government has accorded go-ahead for establishment of the following data centres in the state:
- Zoho Data Centre
- Odisha State Data Centre 2.0
- HCL Tech Data Centre
- High Density Data Centre Ltd.
- Sentraforge AI Data Centre
- RKD Construction Data Centre
Going by the above scenario, Odisha is on the verge of a massive infrastructure development in the field of data science. What will be its implications?
Just compare it with Gujarat, which has only five data centres. Many states are not keen to establish data centres because it poses multiple problems including using huge patches of land for setting up the facilities, consuming large chunks of water for cooling and heavy consumption of electricity. For example, a 10 MW IT data centre could consume approximately 98 million units of electricity per year. Similarly, it would require 11.35 lakh litres water daily. The annual consumption would be around 3-7.3 crore litres. Just imagine its impact on our energy and water resources.
Hence, there will be a strain on both water and electricity supply in the locality. It will also pose serious threat to the environment and ecology in many ways, including disposal of toxic waste. On the other hand, employment generation in these centres is very limited. They need highly-skilled personnel, and there is hardly any scope for the local youth to get direct employment. These are the reasons for which AI Data Centres are being opposed in many parts of the country. It’s being opposed in at least 15 countries in Europe.
I don’t think our policy planners and their political bosses have done adequate homework before allowing setting up of multiple data centres in the state. There should have been sufficient survey and impact assessment of the proposed data centres before giving them green signal. Most of these data centres would be located in and around Bhubaneswar. Time may come when Bhubaneswar citizens will face scarcity of water and electricity supply owing to the operation of data centres.
It will also create different health hazards. Who will be responsible for this? We should not forget that the future generations have a stake in community resources. We don’t have the right to deplete these scarce resources at our command as per our sweet will. The future generations should not suffer for our shortsighted actions and lack of vision. The real test for a data centre project should be whether it generates sufficient economic value, technological advancement, employment opportunities and public revenue to justify its consumption of scarce resources and the proposed incentives to be provided. A comprehensive assessment of an IT data centre project should include the following :
- Projected daily and annual electricity consumption
- Projected daily and annual water consumption
- Source of water and electricity
- Water recycling and zero-liquid-discharge arrangements, wherever technically feasible
- Renewable energy utilisation
- Environmental impact assessment
- Cost of additional infrastructure to be borne by the project proponent.
Therefore, Odisha should adopt a policy requiring every data centre above a specified capacity to disclose its Power Usage Effectiveness (PUE) and Water Usage Effectiveness (WUE), along with independently verified annual consumption.
This is particularly important because a data centre may generate substantial investment but relatively limited direct employment, while imposing considerable demands on electricity, water and public infrastructure.
Will the state government rise to the occasion and review the existing Odisha IT Data Centre Policy 2022, which aims at positioning the state as one of the top five data centre hubs in India and foster a conducive ecosystem for IT, ITeS and ESDM investments?