• Latest
  • Trending
  • All
  • Sport
  • Cricket
  • Odisha
Tunnel construction on Khurda Road-Balangir Rail Line Project

Khurda Road-Balangir Rail Project: Overcoming Major Challenges Of Tunnel Construction

1 year ago
Most Of Those Who Died In Goa Fire Were Migrant Workers Trapped In Basement Kitchen

Most Of Those Who Died In Goa Fire Were Migrant Workers Trapped In Basement Kitchen

4 hours ago
Odisha Crime Branch Arrests Prime Accused In JE Civil Exam 2023 Paper Leak Case

Odisha Crime Branch Arrests Prime Accused In JE Civil Exam 2023 Paper Leak Case

4 hours ago
Shakespeare’s Macbeth Staged During National Seminar At Utkal University

Shakespeare’s Macbeth Staged During National Seminar At Utkal University

5 hours ago
Jaishankar’s “Pakistan Military-Terror Links” Remark Hits A Raw Nerve; Islamabad Reacts

Jaishankar’s “Pakistan Military-Terror Links” Remark Hits A Raw Nerve; Islamabad Reacts

6 hours ago
Care Beyond Hospitals: Odisha’s Cancer Volunteers Unite To Bring Compassion Home

Care Beyond Hospitals: Odisha’s Cancer Volunteers Unite To Bring Compassion Home

7 hours ago
Galwan war memorial

India Unveils World’s Highest War Memorial At Ladakh To Honour Galwan Clash Heroes

7 hours ago
Has Filmmaker Vikram Bhatt Been Arrested For Rs 30 Crore Fraud? Know More

Has Filmmaker Vikram Bhatt Been Arrested For Rs 30 Crore Fraud? Know More

7 hours ago
Indigo refunds

IndiGo Issues Rs 610-Crore Refund; Flight Performance Improves As Operations Stabilise On Day 6

7 hours ago
Wolf Terror In Bahraich: 4-Year-Old Child Dragged Away From Beside Mother, Remains Missing

Wolf Terror In Bahraich: 4-Year-Old Child Dragged Away From Beside Mother, Remains Missing

7 hours ago
Odisha’s 3rd Steel City To Come Up In Keonjhar, Says CM Mohan Majhi

Odisha’s 3rd Steel City To Come Up In Keonjhar, Says CM Mohan Majhi

7 hours ago
Centurion University convocation

3,059 Students Conferred Degrees At 13th Convocation of Centurion University

8 hours ago
BRO Has Become Synonymous With Communication And Connectivity, Rajnath Says While Inaugurating 125 Projects

BRO Has Become Synonymous With Communication And Connectivity, Rajnath Says While Inaugurating 125 Projects

8 hours ago
  • Home
  • About us
  • Career
  • Contact
  • Privacy Policy
  • Terms of Usage
Monday, December 8, 2025
No Result
View All Result
OdishaBytes
  • Home
  • Odisha
    • Policy & Politics
    • City
  • India
  • Sport
    • Cricket
    • Football
    • Hockey
    • IPL
  • Entertainment
    • Music
    • Movie Review
    • Television
    • Bollywood
    • Hollywood
    • Ollywood
  • Business
  • Lifestyle
    • Travel
    • Food
    • Health
    • fashion
  • World
  • More
    • News You Can Use
    • Good News
    • Viral Videos
    • Tech
      • Cars & Bikes
      • Mobile & Gadgets
      • Review
  • Home
  • Odisha
    • Policy & Politics
    • City
  • India
  • Sport
    • Cricket
    • Football
    • Hockey
    • IPL
  • Entertainment
    • Music
    • Movie Review
    • Television
    • Bollywood
    • Hollywood
    • Ollywood
  • Business
  • Lifestyle
    • Travel
    • Food
    • Health
    • fashion
  • World
  • More
    • News You Can Use
    • Good News
    • Viral Videos
    • Tech
      • Cars & Bikes
      • Mobile & Gadgets
      • Review
No Result
View All Result
OdishaBytes
No Result
View All Result
Home Featured

Khurda Road-Balangir Rail Project: Overcoming Major Challenges Of Tunnel Construction

by OB Bureau
August 23, 2024
in Featured, Odisha
Reading Time: 2 mins read
Tunnel construction on Khurda Road-Balangir Rail Line Project
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Bhubaneswar: The Khurda Road-Balangir Rail Line Project, a significant infrastructure initiative under Indian Railways, is progressing with remarkable speed despite facing significant challenges, especially in construction of tunnels in rugged terrain.

These tunnels presented some of the most daunting engineering challenges ever encountered in railway construction.

ADVERTISEMENT

The project, spanning 301 kilometres, is crucial as it will enhance connectivity in remote regions.

Tunnel Construction: Heart Of Project’s Challenges

Under constant scrutiny from Ministry of Railways to ensure timely completion, the project traverses through the rugged and forested terrains between Daspalla and Purunakatak.

In this 75 km stretch, 7 tunnels (total of 12.76 km) are being constructed, which is the most complex and technically demanding aspect of the entire project.

These tunnels are not just about creating passages through mountains, extraordinary obstacles posed by nature and geography have also got to be overcome.

A breakthrough 1.795 km long tunnel (No. 7) was done on August 20, while on August 21, another breakthrough of tunnel No. 1 was conducted successfully.

Khurda road-balangir rail line project

Key Tunnel Sections

* Seven tunnels are under construction, all located between Daspalla and Purunakatak.

* Four major tunnels are in Boudh district, between Adhenigarh and Purunakatak, including the project’s longest tunnel – spanning 4.185 kilometres and featuring a 700-metre escape tunnel for safety.

* Three tunnels in Nayagarh district, 2 of them located between Daspalla and Buguda.

* Tunnel breakthrough successfully completed in 4 tunnels, marking major progress.

Major Challenges In Tunnel Construction

1. Complex Geological Conditions

The geological complexity of the region, with varying soil densities and rock formations, has posed significant difficulties in ensuring tunnel stability and safety. Advanced tunnelling techniques have been employed to manage these diverse conditions, requiring meticulous planning and execution.

2. Environmental Sensitivity & Conservation Efforts

The tunnels pass through environmentally sensitive areas, including wildlife sanctuaries. The project team has had to balance engineering needs with ecological conservation, constructing viaducts and adopting measures to minimize the impact on local wildlife and their habitats.

3. Engineering Precision In Curved Tunnels

Of the 7 tunnels, 5 are with curves ranging from 2.5 to 3 degrees. This demands an exceptional level of precision in engineering, as curved tunnels present unique challenges in terms of alignment and structural integrity.

4. Simultaneous Construction From Both Ends

To expedite the project, tunnel construction is being conducted from both ends simultaneously. This requires meticulous coordination and resource management. Despite the challenges, the project has achieved significant milestones, with tunnel breakthroughs completed in 4 of the 7 tunnels.

5. Strategic Construction Approach

To accelerate progress and timely completion, construction of the tunnels is being carried out simultaneously from both ends. This dual-front approach is crucial for meeting the ambitious timelines set for the project.

Of the 301-km long Khurda Road-Balangir Rail Line project, 199 kilometres have been completed, including 105.8 km from Khurda Road to Daspalla and 93 km from Balangir to Boudh. The remaining segment from Boudh to Purunakatak should be completed within the next few months.

Share196Tweet123
ADVERTISEMENT
OB Bureau

OB Bureau

Related Posts

Odisha Crime Branch Arrests Prime Accused In JE Civil Exam 2023 Paper Leak Case

Odisha Crime Branch Arrests Prime Accused In JE Civil Exam 2023 Paper Leak Case

by OB Bureau
December 7, 2025

Bhubaneswar: After an intensive investigation, the Crime Branch of Odisha Police on Sunday arrested the prime accused in the JE...

Odisha’s 3rd Steel City To Come Up In Keonjhar, Says CM Mohan Majhi

Odisha’s 3rd Steel City To Come Up In Keonjhar, Says CM Mohan Majhi

by Sidharth Kanungo
December 7, 2025

Bhubaneswar: Announcing a host of projects in Keonjhar, Chief Minister Mohan Charan Majhi on Sunday said the mineral-rich district will...

Raipur-Vizag 6-Lane Corridor To Spur Growth In Odisha, 2 Other States

Raipur-Vizag 6-Lane Corridor To Spur Growth In Odisha, 2 Other States

by Sidharth Kanungo
December 7, 2025

Bhubaneswar: The upcoming six-lane greenfield Raipur–Visakhapatnam Economic Corridor being built at a cost of Rs 16,482 crore is set to...

Aashirwad Swain

Mushtaq Ali Trophy: Odisha Complete Hat-Trick Of Victories After 3 Losses

by OB Bureau
December 7, 2025

Lucknow: Having started their campaign in the Syed Mushtaq Ali Trophy with three defeats in a row, Odisha have now...

OdishaBytes

Copyright © 2025 Frontier Media

Navigate Site

  • About
  • Advertise
  • Privacy & Policy
  • Contact
  • News Feed

Follow Us

No Result
View All Result
  • Home
  • Odisha
    • Policy & Politics
    • City
  • India
  • Sport
    • Cricket
    • Football
    • Hockey
    • IPL
  • Entertainment
    • Music
    • Movie Review
    • Television
    • Bollywood
    • Hollywood
    • Ollywood
  • Business
  • Lifestyle
    • Travel
    • Food
    • Health
    • fashion
  • World
  • More
    • News You Can Use
    • Good News
    • Viral Videos
    • Tech
      • Cars & Bikes
      • Mobile & Gadgets
      • Review

Copyright © 2025 Frontier Media